Installed
Capacity
|
22,223 MW |
| Peak Demand
(undiversified) |
21,063 MW |
| No. of Electricity Consumers |
21.63 million |
|
Per
Capita Electricity Consumption in Pakistan
|
approx. 470 kWh/annum |
|
Population having access to Electricity |
approx. 70%
|
| |
|
|
Composition of Installed Capacity (MW) |
| |
PEPCO System |
KESC System |
Total |
| Hydel (WAPDA) |
6444 |
- |
6444 |
| Hydel
(IPPs)** |
111 |
- |
111 |
| Thermal (GENCOs/KESC) |
4885 |
1946 |
6831 |
| Thermal (IPPs) |
7669 |
262 |
7931 |
| Rentals |
122 |
50 |
172 |
| Nuclear(CHASNUPP & KANUPP) |
325 |
137 |
462
|
| Others |
|
272 |
272 |
| Total |
19556 |
2667 |
22223 |
|
|
Power Transmission
System in Pakistan
|
|
Voltage |
|
Length |
| 500 kV |
|
5108
cct.-kms |
| 220 kV |
|
7675
cct.-kms |
| 132 kV |
|
over
21000
cct.-kms |
|
Grid Station |
Nos |
Transformation
Capacity
|
| 500 kV |
12 |
14850 MVA |
| 220 kV |
34 |
18784 MVA |
|
132 kV |
over 600 |
|
| |
|
|
|
*
The data/figures are based on information given in NEPRA
State of Industry Report 2010
available on NEPRA Website
**
includes Jagran and Malakand-III
|
|
Note:
In addition, six (6) IPPs with a gross capacity of
1255
MW have been commissioned
from July 2010 to Jun 2011
i.e. after release of the
NEPRA State of Industry
Report
2010. |
|